The airport has offered two noise insulation grant schemes in the past. The first scheme was associated with the runway extension in 1981 and the second scheme was associated with 24 hour availability in 1994. There have been no significant airport developments (to impact upon noise exposure) since 1994 that would require the airport to offer a further noise insulation grant scheme and therefore no schemes are available at this present time.